宁国都颈装饰工程有限公司

單項(xiàng)選擇題

【案例分析題】

Ravi, like many project (1) , had studied the waterfall model of software development as the primary software life-cycle (2) . He has all set to use it for an upcoming project, his first assignment. However, Ravi found that the waterfall model could not be used because the customer wanted the software delivered in stages, something that implied that the system had to be delivered and built in (3) and not as (4) . The situation in many other projects is not very different. The real world rarely presents a problem in which a standard process, or the process used in a previous project, is the best choice. To be the most situation, an existing process must be (5) to the new problem. A development process, even after tailoring, generally cannot handle change requests. To accommodate change requests without losing control of the project, you must supplement the development process with a requirement change management process.

空白(2)處應(yīng)選擇()

A.activity
B.procedure
C.process
D.progress

題目列表

你可能感興趣的試題

微信掃碼免費(fèi)搜題
锡林浩特市| 梅州市| 宜兴市| 平乡县| 泰和县| 斗六市| 绥棱县| 夏津县| 绥化市| 五原县| 闻喜县| 仙游县| 太康县| 溆浦县| 太白县| 玉林市| 平阴县| 乌兰察布市| 咸阳市| 芮城县| 修武县| 岐山县| 莱芜市| 德昌县| 赣榆县| 舞钢市| 孙吴县| 安义县| 双牌县| 樟树市| 额济纳旗| 柳林县| 读书| 车险| 澜沧| 洛隆县| 贵德县| 扶风县| 稷山县| 南陵县| 镇安县|