宁国都颈装饰工程有限公司

單項(xiàng)選擇題

【案例分析題】

Ravi, like many project (1) , had studied the waterfall model of software development as the primary software life-cycle (2) . He has all set to use it for an upcoming project, his first assignment. However, Ravi found that the waterfall model could not be used because the customer wanted the software delivered in stages, something that implied that the system had to be delivered and built in (3) and not as (4) . The situation in many other projects is not very different. The real world rarely presents a problem in which a standard process, or the process used in a previous project, is the best choice. To be the most situation, an existing process must be (5) to the new problem. A development process, even after tailoring, generally cannot handle change requests. To accommodate change requests without losing control of the project, you must supplement the development process with a requirement change management process.

空白(4)處應(yīng)選擇()

A.parts
B.modules
C.software
D.awhole

題目列表

你可能感興趣的試題

微信掃碼免費(fèi)搜題
罗甸县| 博罗县| 北票市| 印江| 永寿县| 汶上县| 靖宇县| 仁怀市| 大安市| 新丰县| 吴堡县| 霸州市| 清流县| 昌平区| 南充市| 集安市| 阳泉市| 且末县| 尉犁县| 肃北| 威宁| 昭通市| 永济市| 文山县| 仪陇县| 那坡县| 溧阳市| 常州市| 乡城县| 滨海县| 大化| 蕲春县| 周口市| 岱山县| 元朗区| 潼南县| 琼中| 玉环县| 利津县| 武功县| 呈贡县|